Sunday, August 9, 2009

Start of day two- Covered Bridge

We started today at the lovely covered bridge at Westfir , complete with separate pedestrian walkway. From there it was a 60 mile ride with a 2500 ft climb at the 30 mile marker. At the top we had a great lunch which everyone just inhaled, followed by a 30 mile downhill to Mckenzie River. I'm sitting on the porch about 30 ft from the river with bull trout and a few salmon (according to resident flora/fauna expert Peg), sipping a beer before dinner. More pix to follow.

--K of Kobag

1 comment:

buzzy3 said...

lovely little bridge....